Beacon To The Future

Construction Tour
<- back to Project Photos

Running trim and first coats of paint in upper bedrooms, views from the roof, air conditioning units in the rooftop mechanical well, bathroom floor tile, and the sliding fire door for the library.

                                             Page 1 Page 2 Page 3 >>