Beacon To The Future

Construction Tour
<- back to Project Photos

Fifth floor stairs, new windows, floor finishes, bathroom fixtures, wallboard in the hallways, stained glass windows in the library, wallboard throughout the zero floor, and brick pavers in the back lot.

                                             Page 1 Page 2 Page 3 >>